Zalesski Vladimir Vladimirovich : другие произведения.

The Story about the interest in the Bureya theme on January 18, 2019

Самиздат: [Регистрация] [Найти] [Рейтинги] [Обсуждения] [Новинки] [Обзоры] [Помощь|Техвопросы]
Ссылки:
Школа кожевенного мастерства: сумки, ремни своими руками
 Ваша оценка:
  • Аннотация:
    The Story about the interest in the Bureya theme on January 18, 2019

  The Story about the interest in the Bureya theme on January 18, 2019
  
  
  1) The addition to data on dynamics of a situation on a natural dam, a spontaneous reservoir and adjacent territories.
  
  2) Additions to information on large-scale actions for preparation for elimination of a natural dam on the Bureya River.
  
  3) The "additional" publications, which were found during the internet requests (a) "the Bureya hydroelectric power station, January, 2019" (b) "RusHydro, January, 2019, the Bureya River".
  
  4) New (/interesting/curious/) terms on the theme.
  
  
  
  1) The addition to data on dynamics of a situation on a natural dam, a spontaneous reservoir and adjacent territories.
  
  
  
  "12:59, Moscow. January 18. INTERFAX.RU ... According to the Amur Basin Water Administration of Federal Agency for Water Resources, the volume of soil in the landslide is about 34 million cubic meters, from which only 2 million cubic meters are over the Earth's surface ..." [https://www.interfax.ru/russia/646710]
  
  
  
  2) Additions to information on large-scale actions for preparation for elimination of a natural dam on the Bureya River.
  
  
  
  "KRASNAYA VESNA.January 18, 2019 02: 33 / Khabarovsk. Military scientists will help to eliminate the consequences of the landslide in the Khabarovsk territory.
  
  For assistance in clearing of the bed of the Bureya River blocked by the come-down landslide the group of military experts of engineering troops is sent to Khabarovsk Krai, the website of the Russian Defense Ministry reports on January 17.
  
  As a part of group - officers from Military institute (engineering troops) of Military educational scientific center "General Academy of Russian Armed Forces" of M.V. Frunze and the Tyumen highest military and engineering command school of a name of the marshal of engineering troops A.I. Proshlyakov.
  
  These experts have skills in carrying out explosive works and will be a part of the task force operating in the region of a jam is emphasized in the message of department.
  
  Military engineers should execute detailed calculation and trial blasting to check correctness of the carried-out calculations, for performance by this unique on the complexity and volume of a task ..." [https://rossaprimavera.ru/news/0b42fe74]
  
  
  "18 January, 13:44. The aircraft will patrol the Bureya Reservoir during blasting a jam on the river.
  
  Blasting is planned for January 22
  
  MOSCOW, on January 18. / TASS/. The authorities of the Amur region charged [made instructions] to organize patrol from air of the territory of the Bureya Reservoir the day before and in time explosive works on the place of a landslide and also after their end. Measures are taken for safety of inhabitants of the region, the press service of the regional government reported on Friday ...
  
  "After blasting the blockage [the natural dam] according to the most unfavorable forecast, ... water will go upon [along] the ice surface, a wave will form with a crest height of up to three meters at [near] the congestion [the natural dam]. Gradually, as the displacement downstream, due to spreading on the ice surface (of the reservoir) wave height will fall [from of height of three meters] to a level of height of one meter.
  
  As a result, within 12 hours the entire surface of the reservoir will be flooded - from [since] the [point of] congestion [the natural dam] upto the Bureya hydroelectric power station. This situation will pose a direct threat to the life and health of citizens who will be on the reservoir during this period...
  
  For identification of the citizens who are in the territory of a reservoir, we consider as the most optimum to carry out the air patrol", - it is told in the message.
  
  According to the Minister of forestry and fire security of the Amur region Alexey Venhlinskiy, from 18 to 21 January will conduct aerial surveillance with the plane of the Amur air base, 21-22 January before the start of blasting operations in the village of Talakan will be the Mi-8 helicopter, whose crew will conduct a test flight, and to clarify the situation after blasting. In addition, to assist and evacuate citizens from the reservoir, in the village of Talakan will send ten rescuers search and rescue team.
  
  Earlier in administration of the settlement of Talakan of the Bureyky area of TASS reported that on Friday the strengthened land patrol of the Bureya Reservoir began, unauthorized congresses to it are blocked." [https://tass.ru/v-strane/6014864]
  
  
  
  3) The "additional" publications, which were found during the internet requests (a) "the Bureya hydroelectric power station, January, 2019" (b) "RusHydro, January, 2019, the Bureya River".
  
  
  
  "BIG ASIA on December 11, 2018 ... Negotiations were held by the CEO of RusHydro Nikolay Shulginov and the deputy prime minister of Uzbekistan, the Minister of Finance Jamsheed Kuchkarov.
  
  In five years Uzbekistan will build network of 20 new hydroelectric power stations. The Parties agreed that Russia will take part in development of the feasibility study on projects of construction of Mullalaksky and Verkhnepskemsky hydroelectric power station in the republic. Shulginov reported that the RusHydro companies already over a year are in close contact with the Uzbek colleagues and are ready to implementation of mutually advantageous projects in the field of scientific survey works. Let's remind, in November of last year RusHydro and Uzbekgidroenergo signed the memorandum of cooperation in the sphere of hydropower ..." [https://news.rambler.ru/other/41409757-rossiya-pomozhet-uzbekistanu-so-stroitelstvom-ges/]
  
  
  "PJSC RusHydro intends to exact 37 million dollars from Kyrgyzstan
  RUSSIAN NEWSPAPER 2 MORE on November 7, 2018 ...
  
  Deputies of parliament of Kyrgyzstan demanded from the government to report on the taken measures in connection with giving of RusHydro of the claim in the international arbitration court in the Hague. The public joint stock company (public joint stock company) intends to exact from the republic 37 million dollars spent, according to it, on construction of infrastructure facilities on the site of the Upper Naryn cascade of hydroelectric power stations in the Naryn region of the Territory.
  
  The CEO of RusHydro Nikolay Shulginov in an interview to the Russian media told: "Negotiations were conducted, but results any. We work strictly under the intergovernmental agreement of 2012. Kyrgyzstan in the 2016th unilaterally terminated it and has to compensate expenses now. We lawfully demand to return our money - 37 million dollars given in the form of a loan. And we do not consider percent, we can make in this question concessions. We said that we are open for constructive negotiations, but there is no concrete movement towards our side" ...
  
  To build Upper Naryn hydroelectric power stations - Akbulunskaya, Naryn-1,2,3 - charged to the RusHydro company which with republican JSC Elektricheskiye stantsii created joint venture. The cost of all cascade was estimated at 727 million dollars ...
  
  ... There is a hope that the parties will manage to agree without court ..." [https://news.rambler.ru/other/41212737-pao-rusgidro-namerena-vzyskat-s-kirgizii-37-millionov-dollarov/]
  
  
  "Kommersant: RusHydro wants to approve dividends at the level of average size for the last three years ...
  
  MOSCOW, on November 13. / TASS/. The board of directors of a generiruyushcheykompaniya of RusHydro until the end of November has to approve dividend policy ..." [https://news.rambler.ru/other/41260582-rusgidro-hochet-utverdit-dividendy-na-urovne-sredney-velichiny-za-poslednie-tri-goda/]
  
  
  "25.12.2018. Since January 1, 2019 electricity rates for residents of the Chuvash Republic ..." will change [http://www.rushydro.ru/press/holding-news/107294.html]
  
  
  "The governors who failed the elections remained in a prize
  NEWS.RU on November 23, 2018.
  
  ... All governors leaving posts ... are given ... new working assignments [workplaces] which do not differ in a variety: Gazprom, Lukoil and their affiliated structures, RusHydro, Federation Council, Audit Chamber ..." [https://news.rambler.ru/other/41319859-provalivshie-vybory-gubernatory-ostalis-v-vyigryshe/]
  
  
  
  Let's hope that the positions of RusHydro and both hydroelectric power stations on the Bureya river (operating and under construction) regarding the events will be available (until 22 January 2019). We will assume that these positions are formulated and published.
  
  
  
  4) New (/interesting/curious/) terms (phrases).
  
  
  
  "Military scientists" [https://rossaprimavera.ru/news/0b42fe74]
  
  "Amur sea" [http://habarovsk.bezformata.com/listnews/amurskoe-more-foto/14083209/]
  
  
  
  January 18, 2019 16:29
  
  
  Translation from Russian into English: January 18, 2019 20:41.
  Владимир Владимирович Залесский "Рассказ об интересе к Бурейской теме 18 января 2019 г.".
 Ваша оценка:

Связаться с программистом сайта.

Новые книги авторов СИ, вышедшие из печати:
О.Болдырева "Крадуш. Чужие души" М.Николаев "Вторжение на Землю"

Как попасть в этoт список

Кожевенное мастерство | Сайт "Художники" | Доска об'явлений "Книги"