Аннотация: The Story about the interest in the Bureya theme on February 13, 2019
The Story about the interest in the Bureya theme on February 13, 2019
1) Cultural and historical aspect.
"https://tass.ru/obschestvo/6107201
MOSCOW, on February 12. / TASS/. The RusHydro generation company as a token of gratitude will establish to military who helped to cope with the landslide, which blocked the bed of the Bureya River, on the Bureya hydroelectric power station the memorable sign. The head of the company Nikolay Shulginov at the briefing devoted to completion of works on clearing of a landslide reported about it to journalists.
... On the Bureya hydroelectric power station will be organized the exhibition dedicated to a unique operation [works]," he said.
... "The Armed Forces of the Russian Federation are capable to solve quickly and effectively at the highest professional level not only a fighting [a war, a military] problems, but also problems of any level of complexity in the conditions of emergency situations", - Shulginov ... noted" [https://tass.ru/obschestvo/6107201]
2) Information on works on elimination (former) natural dam on the Bureya River.
... The the head of the topology unit [division] of the Eastern Military District colonel Roman SIMAKOV tells about the tasks solved by topographers of the Eastern Military District.
...
- What did the new ... period begin for you with?
- ... Recently, for example, we executed the application for creation of local maps of the top of the Bureya River ... The task of elimination of emergency situation was received by divisions of the Eastern Military District, and its performance required exact data and large-scale maps of this area.
On materials of aerial photography we made the orthophotomap of the area on which there was an emergency situation, and in two options - to a crisis situation and for today on a scale of 1:1000 (in one centimeter 10 meters) and also 1:2000 and 1:5000.
I will note, work on creation of the orthophotomap and specification of a situation lasted the entire period of mitigation of consequences of natural disaster. Specialists of our topographical service and Center of geospatial information and navigation constantly complemented the orthophotomap with new data and manufactured new cards. It allowed command to study and analyse a situation, to effectively plan operation ...
Oleg VERSHININ
13 февраля 2019 г." [http://redstar.ru/pervoprohodtsy-nashego-vremeni/?attempt=1]
3) Addition to data on the dynamics of the situation on the (former) natural dam, (former) spontaneous reservoir and adjacent territories.
"https://tass.ru/obschestvo/6103794
TASS, February 12. The water level near the village of Chekunda, - the closest to the place of landslide on the Bureya river in the Khabarovsk territory, -decreased by 43 cm per day and almost equaled the water level in the reservoir, said TASS on Tuesday the acting head of the water Department of the Amur basin water management of the Federal water resources Agency Nikolai Efimov...
"Now the water level in the reservoir area of hydropower plant is 247,05 cm, and in the area of Chekunda - 250,94 cm. And the water level falls near Chekunda. The last day he fell on 43 cm. And the level of the reservoir, on the contrary, has grown on 9 cm in the past day", - said Efimov.
He noted that additional volumes of water entering the reservoir forced specialists to increase its consumption by 200 cubic meters/s - up to 750 cubic meters/s.
"The levels are almost became an equal but the slot [man-made channel] is still deformed during the passage of water. And while this deformation does not end about the stabilization of the situation to speak prematurely" - said the Agency interlocutor..." [https://tass.ru/obschestvo/6103794]
4) Forecasts about the prospects for solutions to "The Bureya problem".
"https://www.khabkrai.ru/events/news/173019
Official site of the Government of Khabarovsk Krai
Today on February 13, 2019 10:17:50 PM
Another expedition of scientists will go from the Khabarovsk krai to the place of the landslide on the Bureya river. The authorities of the region decided to re-examine the blockage in order to more accurately assess the risks of possible flooding during floods. As last time, the research group will include hydrologists, representatives of science, experts in emergency protection.
As specified in the Committee of the government of the region for civil protection, the expedition will move to Verkhnebureinsky district on February 25. The experts will be there for a few days. During this time, they will make all the necessary measurements, and then analyze the results and issue a conclusion.
We will note that yesterday the Ministry of defence of the Russian Federation reported about the end of blasting operations on the Bureya reservoir...
Press service of the Governor and government of the Khabarovsk territory " [https://www.khabkrai.ru/events/news/173019]
February 13, 2019 18:14
Translation from Russian into English: February 13, 2019 18:58.
Владимир Владимирович Залесский "Рассказ об интересе к Бурейской теме 13 февраля 2019 г.".