  1) information on works on elimination of (former) natural dam on the river Bureya. Gradual summing up. Continued monitoring of the situation in the area of the (former) natural dam on the Bureya river
  
  
  
  "https://www.hab.kp.ru/daily/26942/3993597/
  
  01: 00 2019-02-15 T10: 31: 48+03: 00
  
  To track the flood in the Bureya will be two groups of rescuers from Khabarovsk
  
  Experts will go to the site of the dam in April, observation posts will be located near the village of Chekunda, also directly at the site of the landslide
  
  BORIS KOKURIN
  
  The decision in the spring to send task forces of rescuers to Bureya was made after flight and inspection of the problem site by scientists, staff of the Ministry of Emergency Situations and members of the regional commission on emergency situations.
  
  Representatives of institute of water and environmental problems measured the speed of a current of water in the channel punched by military sappers in a landslide [the natural dam] as well as upstream and downstream. These data will be necessary for them to make the forecast of a flood situation.
  
  The problem place was carefully surveyed by scientists, rescuers and members of KChS of Khabarovsk Krai ...
  
  Now sappers left the the problematic [the difficult] place.
  
  ...
  
  Posts will be established as directly at the channel punched in a landslide [the natural dam] and at the settlement of Chekunda.
  
  ..." [https://www.hab.kp.ru/daily/26942/3993597/]
  
  
  
  
  2) Addition to data on the dynamics of the situation on the (former) natural dam, (former) spontaneous reservoir and adjacent territories.
  
  
  
  
  "http://redstar.ru/ukrotiteli-burei-derzhat-put-domoj/?attempt=3
  
  "Red star"
  
  Tamers Bureya headed home
  
  15.02.2019
  
  Completed the dismantling of the field camp and the export of special goods from the place of elimination of natural dam.
  
  The consolidated detachment of military engineers of the 14th separate guards engineering brigade of the Eastern military district has already been relocated to Khabarovsk. The medical team, calculations of unmanned aerial vehicles also returned to points of a constant dislocation. Now from the area of work on helicopters Mi-8 and Mi-26 transported property and material assets. Ammunition and blasting agents are taken already out completely.
  
  On the site of the blockage [the natural dam] units of the MTO scaling down of field camp, which for months has been a second home for the consolidated group. The servicemen will have to remove 19 tents, diesel generators, turn off communications, food and recreation facilities, a bakery and a small shower complex.
  
  ...
  
  During their stay in the Bureya, military engineers carried out 11 explosions with a capacity of more than 10 tons of TNT each. Explosions allowed to punch at first small to a channel, and then to expand it. Today its width - from 100 to 150 meters, depth - up to 23 meters and length is 254 meters. Capacity - more than 1600 cubic meters of water a second.
  
  ...
  
  Roman BIRYULIN, "Red star"
  
  15 Feb 2019 Bureya" [http://redstar.ru/ukrotiteli-burei-derzhat-put-domoj/?attempt=3]
  
  
  
  3) An overlapping rivers. A dams. A meteorites. General problems of water and energy resources. Russia, world. History, news, forecasts.
  
  
  
  "https://www.rostov.kp.ru/daily/26942/3993883/
  
  15 FEB.13:48 2019-02-15 T13: 53: 16+03: 00
  
  ...
  
  According to the head of Pervomaisky district, the size of the crack is constantly increasing
  
  ALEXANDER STEPANOV
  
  The old dam on the Rostov sea (it is the dam on the pond No. 7), separating this reservoir (which consists of a number of ponds), is in a pre-emergency condition. In other words: she still costs - and even, it seems as, quite strong, but at any time there can be a threat of the beginning of her destruction.
  
  
  THE CRACK WAS PATCHED, WHETHER FOR A LONG PERIOD - THE BIG QUESTION
  
  And the reason for that, said during the meeting of the Committee of the ZS RO [ZS RO - the local parliament] for the construction of Vladimir Nazarenko-acting Director of Rostovmeliovodkhoz (a state institution controlled by the Ministry of Agriculture, which deals with land reclamation and agricultural water supply in the Rostov region), a crack length of almost two meters and a width of 8 centimeters.
  
  In this regard, the dam was assigned a high class of danger, the movement on it is closed.
  
  - There is no leak, - calmed Nazarenko. - We carried out its [crack] bailout (rescue), a situation under control. Its (crack) is regularly examined by divers, all examine.
  
  Meanwhile, the city authorities have a different opinion on this matter. According to the head of the Pervomaisky district of Rostov-on - don Arthur Grigoryan, he personally spoke with divers who checked the condition of the dam, and they said that the crack is actually growing-1 mm per quarter.
  - Under the threat of flooding, if the dam breaks, in the first hour will be immediately 440 houses - said Grigoryan. - I even asked the MOE to conduct exercises in such a case.
  
  - Yes, there is a crack, but there is no threat (breakthrough), - assured, however, Nazarenko. - Probably, some divers dive there, explore something... But the check of the state (dam), which I spoke about, was carried out by experts, and they claim that there are no visible changes. I repeat: we have made a bailout (rescue).
  
  WHOSE IS IT, ROSTOV SEA?
  
  And here is how to be with the construction [to be with the dam] further-it is unclear. It is on the balance of the Federal Ministry of agriculture, which does not allocate money for its maintenance for a long time, because this dam, in simple terms, by and large, does not play any role-it only serves as a watershed between the ponds.
  
  Initially the Rostov sea was created for the purpose of Temernik's cleaning with the help of so-called volley dumpings (up to 10 cubic meters a second) to wash out the bed of this river. It was necessary to construct, however, six more ponds as there was not enough water, and in the 1971st the first dumping which was recognized as effective was carried out. And then the new idea - to build also the Northern reservoir (two reservoirs), for even more high-quality work was born.
  
  But further someone estimated, at last, in what sum rising of water from Aksay to the Rostov sea by means of the pump station manages, and - conclusions were extremely unpleasant: costs of the electric power poured out (literally) in the enormous sum.
  
  In the end the project is not closed completely (nothing was demontaged), but also to operate it as intended in the project, did not. Plus there was disagreement between the departments, who is responsible for what.
  
  And now, since the mid-80s, the Rostov sea has become an ordinary pond. The road on the dam of pond No. 7, let it and one-band also looks unattractively, began to perform the role of an alternativ road toward horticultural associations, located on both sides of the pond.
  
  And here still there a residential district "Platovsky" appeared, traffic grew, and... cars smashed the dam, pressed the dam. A load of the dam really grew many times.
  
  REFUSED TO BUILD A NEW BRIDGE
  
  In December of last year, according to the decision of the Aksai district court, where the Prosecutor's office addressed with the relevant application, the dam for the passage of transport was closed. People, of course, began to complain - that the traffic jams are constant, and ambulances and firefighters can not pass, because the main way - on the shore of the Rostov sea on the Orskaya St. - too loaded. Even wrote the petition on "Active Resident of Rostov" [on line] service (it collected 499 votes pro at one contra), convincing the authorities to construct the new road and to strengthen a dam and to reopen it for journey, however the mayor's office answered categorical "no":
  
  - In borders of Orskaya St. and Rostov sea territories of the city forests included in the federal register in which, according to the Forest code of the Russian Federation, construction of highways and bridges is not allowed are located, - explained in municipal administration. - Also, in borders of Alyabyev St. and Rostov sea, according to Rules of land use and building of the territory of the city, a number of restrictions on use of the land plots in this place is established. Therefore to execute design and construction of the alternative highway around a dam through the Rostov sea now it is not possible.
  
  ALL LOADING [the traffic] LAID DOWN ON A TWO-LANE ROAD ON THE ORSKAYA STREET.
  
  At the meeting of the ZS RO Committee on construction, they also urged not to fantasize: the bridge, at least in the foreseeable future, will not be built. The solution to the problem is to appeal to the Federal level to Moscow has allocated money for strengthening of the dam (Rostovregiongaz on the contrary offers pick up facility on the balance of the region).
  
  But about what sums there is a speech - specifics aren't present. But the damage, if suddenly there is trouble with the break of the dam, Vladimir Nazarenko announced: 3 billion rubles.
  
  Meanwhile, experts warn that given the fact that the passage at the dam is closed, the entire load [the traffic] falls on another dam, the main, on Orskaya St. - along which also, despite the ban, still passing trucks.
  
  How long it [the another dam] will stand - generally difficult to predict."[https://www.rostov.kp.ru/daily/26942/3993883/]
  
  
  "... for the dam [to the Rostov sea] June 2018 set the control indicators whose monitoring is carried out monthly by divers. "In addition, every day 2 times a day, specialists of the Federal state budgetary institution" Rostovmeliovodhoz" made a bypass with inspection of the upper and lower section of the dam with fixing the water level", - added the press service [of thecity administration]." [https://www.rbc.ru/rbcfreenews/5c67429d9a7947d1cc117518]
  
  
  "http://nvgazeta.ru/news/14488/541699/
  
  Network edition "NV Gazeta"
  
  No. 70 of February 15, 2019.
  
  Temernik's transformation. "The first mile" is defined
  
  ...
  
  The concept for the improvement of coastal areas along Temernik, where a linear Park will be created, is not yet completed, the design and surveying work continues.
  
  But the first stage of work has already been approved. But the first stage of works is already approved. It is the 33-kilometer site stretched from Big Saly [Bolshiye Saly] before confluence with Don River. The procedure of a statement is undergone the second stage-a 15-kilometer stretch of the river from the village of Kovalevka. In development there is also the third stage: a part of the course of Temernik along the Bezymyanny stream, the beam of Bolshaya Kamyshevakha from the village of Rassvet along the Rostov sea. Works on design and land surveying of the third stage have to be completed by the end of 2019 ..." [by http://nvgazeta.ru/news/14488/541699/]
  
  
  "https://zen.yandex.ru/media/i_i/aralskoe-more-uje-ne-vosstanovit-5c53fd4d25d7b000b1b38dda
  1 February
  
  While some sources say that now the Aral sea can not be restored even in the next few hundred years, others argue quite the opposite: the Aral sea is gradually recovering.
  
  And all this thanks to the built Kokaral dam. "[https://zen.yandex.ru/media/i_i/aralskoe-more-uje-ne-vosstanovit-5c53fd4d25d7b000b1b38dda]
  
  
  
  4) Chronological comparisons.
  
  
  
  "https://tvzvezda.ru/news/forces/content/201902130347-dsx1.htm
  
  The clean channel Bureya river: chronicle of a special operation of the Ministry of defense of the Russian Federation
  
  Alexey Savelov
  
  08: 08 13.02.2009
  
  "Zvezda" publishes a chain of events related to the landslide descent into the riverbed of the Bureya and its clearing by the Russian military.
  
  February 12, Deputy defense Minister army General Dmitry Bulgakov announced the implementation of orders of Russian President Vladimir Putin on the elimination of congestion on the river Bureya.
  
  ...
  
  December 11, 2018. Then in the Verkhnebureinsky district of the Khabarovsk territory, near the confluence of the Middle Sandar river into the Bureya river, there was a descent of rock, as a result of which about 34 million cubic meters of soil blocked the flow of the river. Nature has created a natural dam with a length of 740 meters, a width of 500 meters and a height of 60 meters.
  
  ...
  
  On January 8, 2019, the President of the Russian Federation instructed the Russian defense Ministry to organize the clearing of the riverbed.
  
  January 10, 2019 was conducted reconnaissance of the collapse area, which resulted in the worst conditions of its possible elimination:
  
  ...
  
  In the period from 11 to 14 January, a self-sufficient grouping of forces and means was formed to deal with the consequences of the collapse. It includes the military personnel of engineering troops of MTO, as well as videoconferencing.
  
  In the shortest possible time, all the necessary material resources in the amount of 500 tons were transferred to the airfield Ukrainka in the Amur region: first of all, engineering ammunition and explosives. Their delivery was carried out by air and rail. By air it was necessary to overcome more than 6000 kilometers, and by rail - more than 1300 kilometers. In total, it took 30 hours. ...The speed of rail transport reached record levels - more than one thousand kilometers per day.
  
  ...
  
  Directly in the area of the collapse of the rock mass performed the tasks of more than 230 people-as part of the integrated team of liquidation of consequences.
  
  From January 18 to February 1, the military managed to equip the proran [the man-made channel] in the formed natural congestion.
  
  From 2 to 10 February, drilling and blasting and engineering works were carried out ... to expand the proran. To date, its parameters have reached a width of 100 to 150 meters, a depth of 23 meters and a length of 254 meters, thus the water capacity has increased to 1600 cubic meters per second.
  
  In total, 11 explosions were carried out with the use of about 300 tons of explosives (about 260 tons of TNT and over 500 cumulative charges). The total amount of development [of removing] of rocky masses exceeded 470 thousand cubic meters.
  
  ..." [https://tvzvezda.ru/news/forces/content/201902130347-dsx1.htm]
  
  
  
  4) Brief chronological information.
  
  
  
  December 12, 2018. In a zone of the Bureya Reservoir there was a descent of rocky soil to overlapping of the bed of the Bureya River around merge to the Sredny SandarRiver (the Middle Sandar River). [http://voda.mnr.gov.ru/activities/list.php?part=17] [http://planet.iitp.ru/news.html]
  
  December 21, 2018. Alexander Markanov and Anatoly Ivanov left on hunting to the Verkhnebureinsky Region of [Khabarovsk Krai] and found out that across the bed of the Bureya River the big heap of stones, the earth and trees appeared. The top of one of hills was demolished. [https://www.dvnovosti.ru/khab/2018/12/25/92975/]
  
  On January 10, 2019 "In Verkhnebureinsky MR of [Khabarovsk Krai] the emergency regime (the decision of the head of the district of 09.01.2019 No. 2) is introduced." [http://voda.mnr.gov.ru/activities/list.php?part=17]
  
  January 10, 2019. The publication (of January 10, 2019) on the Internet:
  "Russian Defense Ministry; Original @mod_russia account
  At the request of the President of Russia Vladimir Putin of force and means of the Russian Defense Ministry are used for clearing of the river course and carrying out drilling-and-blasting works for restoration of the normal hydrological mode of the Bureya Reservoir" [https://twitter.com/mod_russia/status/1083574220213358593].
  
  January 13, 2019. "According to the Ministry of Defence, five VTA planes will be involved: four Il-76 and one An-124 Ruslan which will deliver more than 175 tons of freight to airfields to Khabarovsk Krai. To the place of a jam the engineering equipment and special engineering charges will be delivered by helicopters of army aircraft and the motor transport". [https://www.interfax.ru/russia/645889] (16.01.2019. "Explosives for carrying out engineering works on a blockage to Khabarovsk Krai and the Amur region deliver in hundreds of tons. They are brought echelons by rail. Also the aviation is involved: the largest transport Ruslan An-124 plane delivered to Ukrainka air base for once more than 75 tons of engineering charges ..." [https://tvzvezda.ru/news/forces/content/201901160939-ujum.htm])
  
  January 13, 2019. "January 13, 2019 08: 57"The camp with tents and a field kitchen has already been set up near the reservoir " [https://www.vesti.ru/doc.html?id=3103926&cid=8]
  
  January 13, 2019. "on January 14, 15:52. On Wednesday the governor of Khabarovsk Krai Sergey Furgal visited the place of the landslide in Verkhnebureinsky district" [https://ria.ru/20190116/1549437454.html]
  
  January 17, 2019. In the territory of the Bureya region [of Amur region] the emergency regime (the decision of the head of the district of 17.01.2019 No. 14) is introduced. [http://voda.mnr.gov.ru/activities/list.php?part=17]
  
  January 19, 2019. In borders of the Verkhnebureinsky Region of [Khabarovsk Krai] the emergency regime of regional character (the resolution of the governor of Khabarovsk Krai of 19.01.2019 No. 38-rp) is introduced. [http://voda.mnr.gov.ru/activities/list.php?part=17]
  
  January 21, 2019. (Annually) in the Armed Forces of the Russian Federation the Day of engineering troops is celebrating. [https://tass.ru/armiya-i-opk/6015914?utm_source=yxnews&utm_medium=desktop]
  
  January 22, 2019. "The Metropolitan of Khabarovsk and Priamurie Artemy by helicopter arrived on January 22 in Verkhnebureinsky district" [https://todaykhv.ru/news/incident/18074/]
  
  On January 22, 2019 "... The Deputy Minister of Defence of the Russian Federation Dmitry Bulgakov arrived on January 22 to the Bureya Reservoir..." [https://tvzvezda.ru/news/forces/content/201901220824-qbqi.htm]
  
  On January 24, 2019 "In this flight the crew came very close to the extreme take-off mass of the transport helicopter Mi-26. Unique flight was made by pilots of army aircraft of the Eastern Military District by heavy transport helicopter Mi-26. They transported from Ukrainka air base up to the river bank Bureya the 20-ton bulldozer. In this flight almost maximum take-off mass of this helicopter - 56 tons was reached. It was necessary to sit down on the small platform on the river bank. The task is carried successfully out ... Earlier helicopter pilots delivered a tanker truck fuel-servicing truck to the place of a landslide." [https://tvzvezda.ru/news/forces/content/201901241719-28k3.htm]
  
  On January 28, 2019. "- Several pieces of equipment have passed to the place of blockage by winter road. Military struck [created] the road in the forest with a length of 75 km from the station Ushman to the mouth of the Chelpachi river for four days. Just amazing speed, - the head of Verkhnebureinsky district Alexey Maslov says."[https://todaykhv.ru/news/incident/18166/]
  
  On January 29, 2019. "The dirt road was paved to the location of the explosions from the field camp along the crest of the [natural] dam " [https://asn24.ru/news/crime/59222/]
  
  On January 31, 2019 "on January 31 the governor of the Amur region Vasily Orlov flew by helicopter for Khabarovsk Krai, to the place where on Bureya the hill slope collapsed [where the landslide was ]" [http://www.teleport2001.ru/news/2019-01-31/108115-gubernator-vasiliy-orlov-otpravilsya-k-mestu-zagadochnogo-opolznya-na-reke-buree.html?utm_source=yxnews&utm_medium=desktop]
  
  February 1, 2019. "Today, the soldiers completed the first stage of the rock explosion, which divided the Bureya reservoir into two pools. This was reported by Deputy defense Minister, the Hero of Russia, army General Dmitry Bulgakov during a trip to the place of events."[https://tvzvezda.ru/news/forces/content/201902010706-8huz.htm]
  
  February 1, 2019. "01.02.2019 the channel is punched and hydraulic connection between the cut off part and main part of the Bureya reservoir is established" [http://voda.mnr.gov.ru/activities/detail.php?ID=545145]
  
  On February 2, 2019 "The Bureya hydroelectric power station came to the mode of normal work" [https://tass.ru/proisshestviya/6071841]
  
  February 12, 2019. The military personnel of the consolidated detachment Russian Defense Ministry liquidated the congestion on the Bureya River. [https://function.mil.ru/news_page/country/more.htm?id=12217000@egNews]
  
  February 12, 2019. Rewarding of personnel. According to the results of the unique operation, more than 80 servicemen awarded departmental awards of the Ministry of defense of Russia and more than 300 people with the medal "The Participant of liquidation of consequences of emergency situations on the river Bureya". [https://function.mil.ru/news_page/country/more.htm?id=12217000@egNews]
  
  February 15, 2019. "... Sappers left the the problematic [the difficult] place" [https://www.hab.kp.ru/daily/26942/3993597/]".
  
  
  
  February 16, 2019 04:03
  
  
  
  Translation from Russian into English: February 16, 2019 08:37.
  Владимир Владимирович Залесский "Рассказ об интересе к Бурейской теме утром 16 февраля 2019 г.".
 Ваша оценка:

Связаться с программистом сайта.

Новые книги авторов СИ, вышедшие из печати:
О.Болдырева "Крадуш. Чужие души" М.Николаев "Вторжение на Землю"

Как попасть в этoт список

Кожевенное мастерство | Сайт "Художники" | Доска об'явлений "Книги"