1. "Water levels in a reservoir are both as lower, so above the place of the landslide now became equal"
'http://www.rushydro.ru/press/news/108254.html
RusHydro
Press center of News
14.05.2019
The blockage on the Bureya Reservoir does not interfere with a free drain of water any more
The sizes the proran [the artificial channel] (in the landslide), created by military explosives technicians on the place in the Bureya Reservoir, considerably increased during a spring high water. Capacity the proran increased up to more than 7 thousand cubic meters per second. ... A forecasts of some scientists which were disproved by calculations of military engineers and hydrologists earlier were not confirmed: there is no danger of flooding of settlements, the natural erosion of the proran by the current of water and the restoration of the riverbed of the Bureya continues.
Water levels in a reservoir are lower and above the place of the landslide - evened out. Thus, the blockage ceased [stopped] to create the "threshold". The landslide [the blockage] is not an obstacle for a free drain of water of the Bureya River any more.
Under the influence of a current there was a natural increase in width and depth the proran. Now a vessels of a small size there [through the proran] can pass.
Washout of a blockage continues, according to forecasts of experts this process will take long time.
The flood situation is estimated by experts as quiet. The management of the main department of the Ministry of Emergency Measures of Russia in Khabarovsk Krai made the decision on withdrawal of group of rescuers from the place of the landslide.
Today water level in the Bureya Reservoir makes 242.16 m, having increased in 10 days by 5.5 m. At the same time water level in a reservoir above a blockage dropped [decreased] during this time by 7 m. ... ... the Bureya hydroelectric power station works in the usual mode, planned filling of a reservoir and power production continue.
The landslide in the top part of the Bureya Reservoir became one of the largest in Russia: according to the updated data of its length made 800 meters, height over water level - from 7.5 to 46 meters, the volume about 34 million cubic meters of mainly rocky breed. The reservoir was divided into two isolated parts, the blockage separated 28% of net volume from the Bureya Reservoir. The ... river was blocked that created threat of flooding of the settlements located above a blockage, flooding of engineering constructions of the Baikal-Amur Mainline, risks for navigation on the Bureya River and threat of uncontrollable passing of a spring flood.
The forces and means of the Russian Defense Ministry were used, according the order of the President of Russia Vladimir Putin, for the restoration of the normal hydrological mode of the Bureya Reservoir, also for clearing of the bed of the river and carrying out a drilling-and-blasting [explosive] works. The military personnel with assistance of specialists of RusHydro carried out explosive works that allowed to create by the beginning of February, 2019 the proran into the blockage [into the natural dam]. Through the proran hydraulic communication of two parts of a reservoir was reestablished." [http://www.rushydro.ru/press/news/108254.html]
2. The group of rescuers is delivered up to Khabarovsk
Due to the termination of an active phase of an ice drift on the Bureya River and its inflows by the management of the Ministry of Emergency Situations of Russia of Khabarovsk Krai the decision on withdrawal of group of rescuers from the place of a descent of a December landslide is made.
The group yesterday was transported into Khabarovsk - by the MI-26 helicopter (of the Khabarovsk air rescue center Emercom of Russia). The same helicopter ttransported the equipment and property. (...)
... for monitoring of a situation and rendering, in case of need, the help to citizens, specialists of Emercom of Russia continue to be in the settlement of Chekunda of Verkhnebureinsky district. Let's remind that the group of rescuers kept watch around the Bureya anomaly since April 2, 2019.
As earlier reported the agency, scientists expected that the spring high water in the top part of the Bureya Reservoir will be painless. But there are doubts concerning a situation with floods during passing of summer monsoons.
In the nearest future the complex expedition of Institute of water and environmental problems of the FEB RAS is planned. Scientists will look for weak points where landslides similar to the fact that descended in December of last year can repeat." [https://todaykhv.ru/news/in-areas-of-the-province/20060/?utm_source=yxnews&utm_medium=desktop]
3. Brief chronological information.
December 12, 2018. In a zone of the Bureya Reservoir there was a descent of rocky soil to overlapping of the bed of the Bureya River around merge to the Sredny SandarRiver (the Middle Sandar River). [http://voda.mnr.gov.ru/activities/list.php?part=17] [http://planet.iitp.ru/news.html]
December 21, 2018. Alexander Markanov and Anatoly Ivanov left on hunting to the Verkhnebureinsky Region of [Khabarovsk Krai] and found out that across the bed of the Bureya River the big heap of stones, the earth and trees appeared. The top of one of hills was demolished. [https://www.dvnovosti.ru/khab/2018/12/25/92975/]
On January 10, 2019 "In Verkhnebureinsky MR of [Khabarovsk Krai] the emergency regime (the decision of the head of the district of 09.01.2019 No. 2) is introduced." [http://voda.mnr.gov.ru/activities/list.php?part=17]
January 10, 2019. The publication (of January 10, 2019) on the Internet:
"Russian Defense Ministry; Original @mod_russia account
At the request of the President of Russia Vladimir Putin of force and means of the Russian Defense Ministry are used for clearing of the river course and carrying out drilling-and-blasting works for restoration of the normal hydrological mode of the Bureya Reservoir" [https://twitter.com/mod_russia/status/1083574220213358593].
January 13, 2019. "According to the Ministry of Defence, five VTA planes will be involved: four Il-76 and one An-124 Ruslan which will deliver more than 175 tons of freight to airfields to Khabarovsk Krai. To the place of a jam the engineering equipment and special engineering charges will be delivered by helicopters of army aircraft and the motor transport". [https://www.interfax.ru/russia/645889] (16.01.2019. "Explosives for carrying out engineering works on a blockage to Khabarovsk Krai and the Amur region deliver in hundreds of tons. They are brought echelons by rail. Also the aviation is involved: the largest transport Ruslan An-124 plane delivered to Ukrainka air base for once more than 75 tons of engineering charges ..." [https://tvzvezda.ru/news/forces/content/201901160939-ujum.htm])
January 13, 2019. "January 13, 2019 08: 57"The camp with tents and a field kitchen has already been set up near the reservoir " [https://www.vesti.ru/doc.html?id=3103926&cid=8]
January 13, 2019. "on January 14, 15:52. On Wednesday the governor of Khabarovsk Krai Sergey Furgal visited the place of the landslide in Verkhnebureinsky district" [https://ria.ru/20190116/1549437454.html]
January 17, 2019. In the territory of the Bureya region [of Amur region] the emergency regime (the decision of the head of the district of 17.01.2019 No. 14) is introduced. [http://voda.mnr.gov.ru/activities/list.php?part=17]
January 19, 2019. In borders of the Verkhnebureinsky Region of [Khabarovsk Krai] the emergency regime of regional character (the resolution of the governor of Khabarovsk Krai of 19.01.2019 No. 38-rp) is introduced. [http://voda.mnr.gov.ru/activities/list.php?part=17]
January 21, 2019. (Annually) in the Armed Forces of the Russian Federation the Day of engineering troops is celebrating. [https://tass.ru/armiya-i-opk/6015914?utm_source=yxnews&utm_medium=desktop]
January 22, 2019. "The Metropolitan of Khabarovsk and Priamurie Artemy by helicopter arrived on January 22 in Verkhnebureinsky district" [https://todaykhv.ru/news/incident/18074/]
On January 22, 2019 "... The Deputy Minister of Defence of the Russian Federation Dmitry Bulgakov arrived on January 22 to the Bureya Reservoir..." [https://tvzvezda.ru/news/forces/content/201901220824-qbqi.htm]
On January 24, 2019 "In this flight the crew came very close to the extreme take-off mass of the transport helicopter Mi-26. Unique flight was made by pilots of army aircraft of the Eastern Military District by heavy transport helicopter Mi-26. They transported from Ukrainka air base up to the river bank Bureya the 20-ton bulldozer. In this flight almost maximum take-off mass of this helicopter - 56 tons was reached. It was necessary to sit down on the small platform on the river bank. The task is carried successfully out ... Earlier helicopter pilots delivered a tanker truck fuel-servicing truck to the place of a landslide." [https://tvzvezda.ru/news/forces/content/201901241719-28k3.htm]
On January 28, 2019. "- Several pieces of equipment have passed to the place of blockage by winter road. Military struck [created] the road in the forest with a length of 75 km from the station Ushman to the mouth of the Chelpachi river for four days. Just amazing speed, - the head of Verkhnebureinsky district Alexey Maslov says."[https://todaykhv.ru/news/incident/18166/]
On January 29, 2019. "The dirt road was paved to the location of the explosions from the field camp along the crest of the [natural] dam " [https://asn24.ru/news/crime/59222/]
On January 31, 2019 "on January 31 the governor of the Amur region Vasily Orlov flew by helicopter for Khabarovsk Krai, to the place where on Bureya the hill slope collapsed [where the landslide was ]" [http://www.teleport2001.ru/news/2019-01-31/108115-gubernator-vasiliy-orlov-otpravilsya-k-mestu-zagadochnogo-opolznya-na-reke-buree.html?utm_source=yxnews&utm_medium=desktop]
February 1, 2019. "Today, the soldiers completed the first stage of the rock explosion, which divided the Bureya reservoir into two pools. This was reported by Deputy defense Minister, the Hero of Russia, army General Dmitry Bulgakov during a trip to the place of events."[https://tvzvezda.ru/news/forces/content/201902010706-8huz.htm]
February 1, 2019. "01.02.2019 the channel is punched and hydraulic connection between the cut off part and main part of the Bureya reservoir is established" [http://voda.mnr.gov.ru/activities/detail.php?ID=545145]
On February 2, 2019 "The Bureya hydroelectric power station came to the mode of normal work" [https://tass.ru/proisshestviya/6071841]
February 12, 2019. The military personnel of the consolidated detachment Russian Defense Ministry liquidated the congestion on the Bureya River. [https://function.mil.ru/news_page/country/more.htm?id=12217000@egNews]
February 12, 2019. Rewarding of personnel. According to the results of the unique operation, more than 80 servicemen awarded departmental awards of the Ministry of defense of Russia and more than 300 people with the medal "The Participant of liquidation of consequences of emergency situations on the river Bureya". [https://function.mil.ru/news_page/country/more.htm?id=12217000@egNews]
February 15, 2019. "... Sappers left the the problematic [the difficult] place" [https://www.hab.kp.ru/daily/26942/3993597/]'.
April 2, 2019. To the place of the landslide on the Bureya River the group of rescuers [Ministry of Emergency Situations] is brought. [https://www.vesti.ru/doc.html?id=3133238&utm_source=yxnews&utm_medium=desktop]
April 4, 2019. A situation with overlapping of the bed of the Bureya River in Verkhnebureinsky district as a result of a landslide was discussed by participants of a meeting of committee of the Legislative Duma of [Khabarovsk] Krai concerning construction, housing and public utilities and energy industry . [http://www.duma.khv.ru/Site.aspx?doc=270135036]
April 5, 2019. The Minister of Emergency Situations of the Russian Federation Evgeny Zinichev, being in a working trip in Khabarovsk Krai, got acquainted with the situation developing as a result of a soil descent onto the bed of the Bureya River. ... He estimated a situation ... In field camp E. Zinichev held a coordination meeting [https://vk.com/gumchskhabarovsk]
April 21, 2019. "... In Verkhnebureinsky district, in the village Chekunda, on the morning of April 21, arrived the second group of rescuers EMERCOM of Russia..." [http://27.mchs.gov.ru/pressroom/news/item/8037819]
May 07, 2019. "... the proran [the artificial channel] for the passage of water (punched [created] by the military) began to expand rapidly... When the ice drift began, water began to expand passage for itself ... it began at night. ... in the morning ... [people] saw that proran five times wider became ..." [https://todaykhv.ru/news/in-areas-of-the-province/19988/] (The beginning of the intensive natural destruction of the spontaneous dam and the natural widening of the artificial channel). (http://27.mchs.gov.ru/pressroom/news/item/8076274/)
May 12, 2019. The return of group of rescuers from the place of the landslide (on the Bureya River) up to Khabarovsk. Publication (may 13, 2019) on the Internet: "the group was delivered to Khabarovsk yesterday by the MI-26 Helicopter of the Khabarovsk aviation and rescue center of the EMERCOM of Russia. The same Helicopter delivered equipment and property. (...) ... specialists of EMERCOM of Russia continue to be in the settlement of Chekunda of the Verkhnebureinsky district". [https://todaykhv.ru/news/in-areas-of-the-province/20060/?utm_source=yxnews&utm_medium=desktop]
May 14, 2019. The publication (of May 14, 2019) on the Internet: "Water levels in a reservoir are both as lower so above the place of a landslide now became equal". [http://www.rushydro.ru/press/news/108254.html]
May 15, 2019 19:01
Translation from Russian into English: May 15, 2019 23:31.
Владимир Владимирович Залесский 'Рассказ об интересе к Бурейской теме 15 мая 2019 г.'.